Drag
Ontex
Area

Client

Ontex

Location

Silivri, Istanbul

Year

2021

Ontex

Industrial

Built as the Turkish investment of Belgium-based Ontex Group, this facility was constructed to a steel frame system simultaneously meeting EU CE construction directives, LEED energy efficiency prerequisites and TBEC-2018 seismic requirements — and passed both local and international independent engineering audits.

Project Challenges

Building the Turkish facility of an international nappy manufacturer to EU CE directives and LEED criteria.

For the Turkish investment of Belgium-based Ontex Group, a wide-span production building and administrative office block meeting EU CE construction directives and LEED certification prerequisites — while fully compliant with TBEC-2018 — had to be constructed together. An international independent engineering firm supervised all processes.


Our Solutions

A steel frame system compliant with European CE directives was selected. The building envelope used sandwich panels and thermal-bridge-breaking details meeting LEED energy criteria. All fabrication and material tests were approved by both local and international inspectors; the project was delivered on time and within budget.

CE-directive-compliant steel frame, LEED energy efficiency criteria and a two-tier international audit process — all successfully completed.

Driven by our love for people and the environment and respect for our craft, we have been providing architectural and contracting services since 2010.

Home Yapı Mühendislik